Attention! Ours sait has moved. Automatic transition - in 60 seconds.

SSP : forecasting of failures of the rail elevating crane...
Search of the reason of failures of a rail transport, bridge cranes (rail elevating cranes) and many other things
About us Services Equipment Examples References Connection ? Ru
List of examples:
Example 1
Example 2
Example 3
Example 4
Example 5
Example 6
Example 7
Example 8
Example 9
Example 10
Example 11
Example 12
Example 13
Example 14
Example 15
Example 16
Example 17
Example 18
Example 19
Example 20
Example 21
Example 22

Forecasting of crash of the traveling crane

     Rather frequently during building there is a fall of the elevating crane. As the reason of this crash always name poor-quality ramming of embankment at installation of a rails. However application of special quality monitoring of preparation of embankment does not reduce quantity of these failures.
     Actually, fall of the elevating crane occurs then when influence of a tectonic disturbance does an effect only on one rail (see the previous example). In that case to avoid failure it is possible would be by insignificant displacement of rails.



To start | About us | Services | Equipment | Examples of works | References | Connection | About the project | Ru

TopList world1000